摘要:This article provides a methodical description of resource-time analysis for a wide range of requirements imposed for resource consumption processes in scheduling tasks during the construction of high-rise buildings and facilities. The core of the proposed approach and is the resource models being determined. The generalized network models are the elements of those models, the amount of which can be too large to carry out the analysis of each element. Therefore, the problem is to approximate the original resource model by simpler time models, when their amount is not very large.