期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2018
卷号:7
期号:2
页码:1454
DOI:10.15680/IJIRSET.2018.0702077
出版社:S&S Publications
摘要:Delay in construction projects is one of the foremost concerns in the Indian construction industry. Thedelays to the projects are affecting the economies throughout the world. Delay to projects mean the slowdown ofdevelopment in all other related fields. Over 40% of Indian construction projects are facing time overrun ranging from1 to 252 months (Source: MOSPI) the reasons for which are being studied by researchers to suggest possible remedialmeasures. There is strong evidence of inconsistent performance of the Indian construction projects and the trend isgrowing rapidly, and projects are reportedly failing across all the key performance measures, including cost, time, andquality performances. This paper identifies 35 attributes responsible for impacting performance of the projects. Theseattributes were then presented to Indian construction professionals in the form of a questionnaire. This study aims toidentify the factors affecting construction projects scheduling and incorporating the critical factors to improve theschedule performance.
关键词:India; construction industry; delays; scheduling; performance.