期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2016
卷号:5
期号:10
页码:17981
DOI:10.15680/IJIRSET.2016.0510103
出版社:S&S Publications
摘要:Delay in the completion of a construction project can be a major problem for contractor companies leadingto costly disputes and adverse relationships amongst project participants. Projects can be delayed for a large numberof reasons. The reasons are related to the various types of uncertainty associated with activities during the constructionprocess. This research was conducted to determine the most important causes of delays within building projects in Indonesia.A questionnaire survey was carried out targeting 89 respondents from large contractors and 23 respondentsfrom small contractors. The respondents were asked to assess the level of effect the 31 potential delay causes on theirprojects.The delay factors were grouped into six major groups. The level of importance of the delay variables andthe groups were computed and ranked for both the large and small contractors. Personal interviews were conducted toclarify responses. The agreement between the rankings of delay causes of two groups contractors were measured usingSpearman Rank Correlation Coefficients. The results showed that the large and small contractors generally agree on theimportance ranking of the individual delay variables. In relation to the groups of the delay variable, however, the resultshowed that there is no agreement between the two groups of contractors. The professional management group wasranked the highest and the external groups was ranked the lowest by large contractors. Whereas, small contractorsranked the design and documentation group as the highest and the execution group as the lowest.