  • 标题:The End User Requirement for Project Management Software Accuracy
  • 其他标题:The End User Requirement for Project Management Software Accuracy
  • 本地全文:下载
  • 作者:Fachrurrazi Fachrurrazi
  • 期刊名称:International Journal of Electrical and Computer Engineering
  • 电子版ISSN:2088-8708
  • 出版年度:2018
  • 卷号:8
  • 期号:2
  • 页码:1112-1121
  • DOI:10.11591/ijece.v8i2.pp1112-1121
  • 语种:English
  • 出版社:Institute of Advanced Engineering and Science (IAES)
  • 摘要:This research explains the relationship between the end user requirement and accuracy of PMS (Project Management Software). The research aims are to analyze the PMS accuracy and measuring the probability of PMS accuracy in achieving ±1% of the end user requirement. The bias statistical method will be used to prove the PMS accuracy that based on the hypothesis testing. The result indicates the PMS is still accurate to be implemented in Aceh-Indonesia area projects that using the SNI (National Indonesia Standard as current method) with the accuracy index of ±7.5%. The achievement probability of reaching the end user requirement is still low of ±21.77%. In case of the PMS, the low achievement of the end user requirement is not only caused by the low accuracy of the PMS but also caused by the amount of variability error, which is influenced by the amount of variation of the project activity. In this study, we confirm that it is necessary to reconcile both conditions between the PMS accuracy and the end user requirements.
  • 其他摘要:This research explains the relationship between the end user requirement and accuracy of PMS (Project Management Software). The research aims are to analyze the PMS accuracy and measuring the probability of PMS accuracy in achieving ±1% of the end user requirement. The bias statistical method will be used to prove the PMS accuracy that based on the hypothesis testing. The result indicates the PMS is still accurate to be implemented in Aceh-Indonesia area projects that using the SNI (National Indonesia Standard as current method) with the accuracy index of ±7.5%. The achievement probability of reaching the end user requirement is still low of ±21.77%. In case of the PMS, the low achievement of the end user requirement is not only caused by the low accuracy of the PMS but also caused by the amount of variability error, which is influenced by the amount of variation of the project activity. In this study, we confirm that it is necessary to reconcile both conditions between the PMS accuracy and the end user requirements.
  • 关键词:Civil Engineering; Project Mangement; Information Management System;Project Management Software; National Indonesia Standard; Accuracy Index; Achievement Probability; End User Requirement; Bias%; Hypothesis Testing