期刊名称:International Journal of Electrical and Computer Engineering
电子版ISSN:2088-8708
出版年度:2015
卷号:5
期号:3
页码:477-482
DOI:10.11591/ijece.v5i3.pp477-482
语种:English
出版社:Institute of Advanced Engineering and Science (IAES)
摘要:This paper deals with multiprocessor scheduling with rejection technique where each job is provided with processing time and a given penalty cost. If the job satisfies the acceptance condition, it will schedule in the least loaded identical parallel machine else job is rejected. In this way its penalty cost is calculated. Our objective is to minimize the makespan of the scheduled job and to minimize the sum of the penalties of rejected jobs. We have merged ‘CHOOSE ‘and ‘REJECTION PENALTY’ algorithm to reduce the sum of penalties cost and makespan. Our proposed ‘Improved Reject penalty algorithm’ reduce competitive ratio, which in turn enhances the efficiency of the on-line algorithm. By applying our new on-line technique, we got the lower bound of our algorithm is is 1.286 which is far better from the existing algorithms whose competitive ratio is at 1.819. In our approach we have consider non-preemption scheduling technique.
其他摘要:This paper deals with multiprocessor scheduling with rejection technique where each job is provided with processing time and a given penalty cost. If the job satisfies the acceptance condition, it will schedule in the least loaded identical parallel machine else job is rejected. In this way its penalty cost is calculated. Our objective is to minimize the makespan of the scheduled job and to minimize the sum of the penalties of rejected jobs. We have merged ‘CHOOSE ‘and ‘REJECTION PENALTY’ algorithm to reduce the sum of penalties cost and makespan. Our proposed ‘Improved Reject penalty algorithm’ reduce competitive ratio, which in turn enhances the efficiency of the on-line algorithm. By applying our new on-line technique, we got the lower bound of our algorithm is is 1.286 which is far better from the existing algorithms whose competitive ratio is at 1.819. In our approach we have consider non-preemption scheduling technique.