首页    期刊浏览 2025年12月03日 星期三
登录注册

文章基本信息

  • 标题:Modelling the effects of time and non-time related cost factors on final cost of building construction projects in northern Nigeria
  • 本地全文:下载
  • 作者:N Gambo ; A.I. Shehu ; G Ibrahim
  • 期刊名称:ATBU Journal of Environmental Technology
  • 电子版ISSN:1596-6035
  • 出版年度:2017
  • 卷号:10
  • 期号:2
  • 页码:129-147
  • 出版社:African Journals Online
  • 摘要:

    The study assessed the effects of time and non-time related cost factors on final cost of construction projects in Northern Nigeria. Data on the cost of construction projects were collected directly from projects files of 40 completed building projects in Northern Nigeria using well-designed questionnaires administered to clients, contractors and consultants, selected from the studied states, based on proportionate stratified random sampling technique. WARP6 PLS-SEM software was used in the analysis of the collated data. The results indicated High effects between time and non-time related cost factors and the final cost of building projects in Northern Nigeria. Similarly, linear relationships exist between time and non-time related cost factors and the final cost of building projects. Furthermore, the study provided criteria for assessing the effects of time and non-time related cost factors on the final cost. The study suggests ways of mitigating the effects of these factors (time and non-time related cost factors) on final cost of construction projects in Nigeria, which among others; include adequate estimation, prime cost and provisional sums. Primarily, clients should be cautious of variation orders and comprehensive design before project awards.

  • 关键词:Cost of Buildings; Northern Nigeria; and Time related; Non time related
国家哲学社会科学文献中心版权所有