期刊名称:IOP Conference Series: Earth and Environmental Science
印刷版ISSN:1755-1307
电子版ISSN:1755-1315
出版年度:2018
卷号:189
期号:2
页码:022059
DOI:10.1088/1755-1315/189/2/022059
语种:English
出版社:IOP Publishing
摘要:When the TBM passes through the weak and broken strata, it is easy to get stuck and be buried. Through the advance pre grouting engineering practice of TBM crossing fault zone in Qingdao area, the pre grouting reinforcement measures for preventing the occurrence of TBM card machine are explored, including grouting pressure, grouting drilling design, grouting material and other key parameters. The research results show that the surface pre grouting method is an effective grouting measure to prevent the occurrence of TBM stuck and buried accidents. Single cement slurry and C-S double slurry are used as grouting materials. The cement slurry is used to fill the void in soft broken stratum and C-S double slurry is used to improve the controllability of slurry diffusion. In the process of advanced pre-grouting construction on the ground surface, the application of progressive segmental grouting technology and membrane bag sealing grouting technology can effectively guarantee the strengthening range of soft ground and improve the effect of grouting reinforcement.