期刊名称:International Journal of Advanced Computer Science and Applications(IJACSA)
印刷版ISSN:2158-107X
电子版ISSN:2156-5570
出版年度:2019
卷号:10
期号:2
页码:293-300
DOI:10.14569/IJACSA.2019.0100239
出版社:Science and Information Society (SAI)
摘要:This paper proposes a method for determining location and calculating the minimum amount of power load needed to shed in order to recover the frequency back to the allowable range. Based on the consideration of the primary control of the turbine governor and the reserve power of the generators for secondary control, the minimum amount of load shedding was calculated in order to recover the frequency of the power system. Computation and analysis of the phase electrical distance between the outage generator and the loads to prioritize distribution of the amount power load shedding at load bus positions. The nearer the load bus from the outage generator is, the higher the amount of load shedding will shed and vice versa. With this technique, a large amount of load shedding could be avoided, hence, saved from economic losses, and customer service interruption. The case study simulation has been verified through using PowerWorld sofware systems. The effectiveness of the proposed method tested on the IEEE 37 bus 9 generators power system standard has demonstrated the effectiveness of this method.