首页    期刊浏览 2024年09月20日 星期五
登录注册

文章基本信息

  • 标题:How to Measure the Robustness of Shunting Plans
  • 本地全文:下载
  • 作者:Roel van den Broek ; Han Hoogeveen ; Marjan van den Akker
  • 期刊名称:OASIcs : OpenAccess Series in Informatics
  • 电子版ISSN:2190-6807
  • 出版年度:2018
  • 卷号:65
  • 页码:1-13
  • DOI:10.4230/OASIcs.ATMOS.2018.3
  • 出版社:Schloss Dagstuhl -- Leibniz-Zentrum fuer Informatik
  • 摘要:The general problem of scheduling activities subject to temporal and resource constraints as well as a deadline emerges naturally in numerous application domains such as project management, production planning, and public transport. The schedules often have to be implemented in an uncertain environment, where disturbances cause deviations in the duration, release date or deadline of activities. Since these disruptions are not known in the planning phase, we must have schedules that are robust, i.e., capable of absorbing the disturbances without large deteriorations of the solution quality. Due to the complexity of computing the robustness of a schedule directly, many surrogate robustness measures have been proposed in literature. In this paper, we propose new robustness measures, and compare these and several existing measures with the results of a simulation study to determine which measures can be applied in practice to obtain good approximations of the true robustness of a schedule with deadlines. The experiments are performed on schedules generated for real-world scheduling problems at the shunting yards of the Dutch Railways (NS).
  • 关键词:robustness; resource-constrained project scheduling; partial order schedule; uncertainty; Monte Carlo simulation; train shunting
国家哲学社会科学文献中心版权所有