期刊名称:IOP Conference Series: Earth and Environmental Science
印刷版ISSN:1755-1307
电子版ISSN:1755-1315
出版年度:2019
卷号:267
期号:4
页码:1-6
DOI:10.1088/1755-1315/267/4/042007
出版社:IOP Publishing
摘要:In this paper, the excavation process of a cross-street tunnel construction is studied. In order to ensure the normal construction, three kinds of advanced support combination schemes are preliminarily worked out. Scheme one: leading anchor pipe + sleeve driving small pipe Grouting; Scheme two: horizontal rotary jet grouting piles+ sleeve driving small pipe grouting; scheme three: horizontal rotary jet grouting piles+ large pipe shed+ sleeve driving small pipe grouting; Combined with the existing practical engineering cases, using the finite element software ANSYS to simulate the tunnel excavation process and verify the results, the settlement and displacement curves of the surface and vault and the convergence time history curves of the side walls are compared, and the effect of structural stress control is analysed. Among them, the third scheme has great advantages. Therefore, considering all factors, the third scheme is adopted as the pre-support scheme of the tunnel.