期刊名称:IOP Conference Series: Earth and Environmental Science
印刷版ISSN:1755-1307
电子版ISSN:1755-1315
出版年度:2019
卷号:252
期号:5
页码:1-8
DOI:10.1088/1755-1315/252/5/052104
出版社:IOP Publishing
摘要:Interwell Dynamic Connectivity is an important basis for reservoir development and adjustment. A method for calculating interwell connectivity using production and injection data was established, which was based on capacitance model and material balance equation. And the interwell connectivity, time lag and the influence of fluid influx were considered in the method. Using numerical simulation verify that Established method can effectively deal with reservoirs with fluid influx.