  • 标题:Study on construction schedule optimization of bored pile based on genetic algorithm
  • 本地全文:下载
  • 作者:Hesong Hu ; Xuan Ji ; Huqing Liang
  • 期刊名称:IOP Conference Series: Earth and Environmental Science
  • 印刷版ISSN:1755-1307
  • 电子版ISSN:1755-1315
  • 出版年度:2019
  • 卷号:300
  • 期号:2
  • 页码:1-9
  • DOI:10.1088/1755-1315/300/2/022020
  • 出版社:IOP Publishing
  • 摘要:The site construction management of traditional filling pile has some disadvantages such as redundancy of data, difficulty in finding data, low working efficiency and poor timeliness. Thus, combined with the actual needs of filling pile construction management, based on the Java language, the mobile phone client of filling pile construction information management system was developed, and the mobile client system framework, operating process and functional framework were designed and illustrated. The software provided an advanced management method for the filling pile construction, it had great value to guarantee the construction progress and improve the information level of construction management.
国家哲学社会科学文献中心版权所有