摘要:In order to ensure the safety of the population around objects and industries that are sources of impact on the environment and human health, a special territory is established with a special regime of use - the sanitary protection zone (SPZ). According to the regulatory framework of Russia, the approximate size of the SPZ should be justified by the project of a sanitary protection zone with calculations of expected air pollution and levels of physical impact on atmospheric air, and confirmed by the results of field studies and measurements. This paper analyzes the requirements and possibilities for establishing the boundaries of the SPZ for a state regional electric power plant (SREPP). The paper presents an example of the established SPZ boundaries of the energy company, where all calculated indicators correspond to sanitary and construction norms and rules, and the company does not need to create a new SPZ project. The new requirements for defining the SPZ boundaries from 2018 are presented, and terms of object outline, areal object and circuit are analyzed.
其他摘要:In order to ensure the safety of the population around objects and industries that are sources of impact on the environment and human health, a special territory is established with a special regime of use - the sanitary protection zone (SPZ). According to the regulatory framework of Russia, the approximate size of the SPZ should be justified by the project of a sanitary protection zone with calculations of expected air pollution and levels of physical impact on atmospheric air, and confirmed by the results of field studies and measurements. This paper analyzes the requirements and possibilities for establishing the boundaries of the SPZ for a state regional electric power plant (SREPP). The paper presents an example of the established SPZ boundaries of the energy company, where all calculated indicators correspond to sanitary and construction norms and rules, and the company does not need to create a new SPZ project. The new requirements for defining the SPZ boundaries from 2018 are presented, and terms of object outline, areal object and circuit are analyzed.