首页    期刊浏览 2024年11月25日 星期一
登录注册

文章基本信息

  • 标题:Technological Indicators of Direct Dumping Zone as a Part of Combined Mining Method
  • 本地全文:下载
  • 作者:Andrey Sysoev ; Elena Zlobina ; Igor Katanov
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2019
  • 卷号:105
  • 页码:1-6
  • DOI:10.1051/e3sconf/201910501050
  • 出版社:EDP Sciences
  • 摘要:Under the conditions of a combined mining system overburden is developed using a transport and non-transport technologies, specific costs for non-transport technology are lower than transport costs. The change in the non-transport bench height led to the redistribution of the volumes of transport and non-transport overburden. With an increase in the volume of non-transport overburden, the share of more expensive transport overburden is decreases, while the technical and economic indicators of the non-transport zone deteriorate due to an increase in re-excavation volumes. The change in the non-transport bench height affects the recasting ratio and the annual advance coal face line, which determine the cost of developing the overburden. This article presents the results of a study of the laws of change in the recasting ratio and the annual advance coal face line, depending on the non-transport bench height within a combined mining system of flat seam. The obtained patterns were established as a result of solving problems of substantiating typical excavation schemes of the direct dumping method and developing a mathematical model for identifying excavation schemes with the subsequent calculation of their technological indicators.
  • 其他摘要:Under the conditions of a combined mining system overburden is developed using a transport and non-transport technologies, specific costs for non-transport technology are lower than transport costs. The change in the non-transport bench height led to the redistribution of the volumes of transport and non-transport overburden. With an increase in the volume of non-transport overburden, the share of more expensive transport overburden is decreases, while the technical and economic indicators of the non-transport zone deteriorate due to an increase in re-excavation volumes. The change in the non-transport bench height affects the recasting ratio and the annual advance coal face line, which determine the cost of developing the overburden. This article presents the results of a study of the laws of change in the recasting ratio and the annual advance coal face line, depending on the non-transport bench height within a combined mining system of flat seam. The obtained patterns were established as a result of solving problems of substantiating typical excavation schemes of the direct dumping method and developing a mathematical model for identifying excavation schemes with the subsequent calculation of their technological indicators.
国家哲学社会科学文献中心版权所有