首页    期刊浏览 2024年11月24日 星期日
登录注册

文章基本信息

  • 标题:Research in the Impact of Dynamic Loads for the Development of Pentice Designs when Sinking Skip Shafts
  • 本地全文:下载
  • 作者:Vladimir Pershin ; Aleksandr Kopytov ; Ahmed Wetti
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2019
  • 卷号:105
  • 页码:1-6
  • DOI:10.1051/e3sconf/201910501056
  • 出版社:EDP Sciences
  • 摘要:In order to protect workers engaged in shaft sinking works artificial protective equipment (buntons) with the support element from powerful I-beams or truss structures are used. They have to withstand enormous push loading, be strong, simple in design, have less labor input during construction and dismantling. Under shaft sinking in case of skip operational winding performance, a protective bunton can be exposed to the rock mass flow in the event of an emergency full skip run. To substantiate the variables and develop the design of pentices when sinking an active hoisting shaft, the skip falls time dependence on the changes in its fall height, taking into account the velocity and the air stream direction in the shaft, was established using mathematical modeling. LLC “SibGorComplexEngineering” together with the Department of Construction of Underground Structures and Mines of T.F. Gorbachev Kuzbass State Technical University have developed several new designs variants of protective buntons for vertical shafts sinking in case of operational winding performance. It is a Z-shaped structure of the offset in height, parallel to each other of upper and lower protective buntons, bushed with sloped reflective metal sheets and it is interconnected by a vertical division wall.
  • 其他摘要:In order to protect workers engaged in shaft sinking works artificial protective equipment (buntons) with the support element from powerful I-beams or truss structures are used. They have to withstand enormous push loading, be strong, simple in design, have less labor input during construction and dismantling. Under shaft sinking in case of skip operational winding performance, a protective bunton can be exposed to the rock mass flow in the event of an emergency full skip run. To substantiate the variables and develop the design of pentices when sinking an active hoisting shaft, the skip falls time dependence on the changes in its fall height, taking into account the velocity and the air stream direction in the shaft, was established using mathematical modeling. LLC “SibGorComplexEngineering” together with the Department of Construction of Underground Structures and Mines of T.F. Gorbachev Kuzbass State Technical University have developed several new designs variants of protective buntons for vertical shafts sinking in case of operational winding performance. It is a Z-shaped structure of the offset in height, parallel to each other of upper and lower protective buntons, bushed with sloped reflective metal sheets and it is interconnected by a vertical division wall.
国家哲学社会科学文献中心版权所有