摘要:This scientific article researches features of preparations for the construction of renovation projects areas on the example of the city of Moscow. The purpose of the article is to examine and study features of preparations for the construction of renovation projects areas, these feature’s being one of the factors determining energy efficiency activities application at a construction site. Statistical data compilation method, regulatory documents examination method and method of review, comparison and consolidation of information are used in this paper. In the context of the research engineering equipment provision of housing stock renovation sites is analysed and renovation areas classification based on water, heat and power supply system’s provision is provided. As a result of the analysis of five renovation areas, a number of specific features of renovation areas engineering equipment provision are identified. For the most part Moscow renovation areas are divided into two forms: energy-deficient (EP) which lack reserve margins of fuel and power resources; energy-excessive (ER) which have an excess supply of fuel and power resources. Energy-balanced areas (EB) are considered to be of the highest possible level of renovation areas development.
其他摘要:This scientific article researches features of preparations for the construction of renovation projects areas on the example of the city of Moscow. The purpose of the article is to examine and study features of preparations for the construction of renovation projects areas, these feature’s being one of the factors determining energy efficiency activities application at a construction site. Statistical data compilation method, regulatory documents examination method and method of review, comparison and consolidation of information are used in this paper. In the context of the research engineering equipment provision of housing stock renovation sites is analysed and renovation areas classification based on water, heat and power supply system’s provision is provided. As a result of the analysis of five renovation areas, a number of specific features of renovation areas engineering equipment provision are identified. For the most part Moscow renovation areas are divided into two forms: energy-deficient (EP) which lack reserve margins of fuel and power resources; energy-excessive (ER) which have an excess supply of fuel and power resources. Energy-balanced areas (EB) are considered to be of the highest possible level of renovation areas development.