摘要:This paper focuses on a methodology allowing to derive the pumping schedule in Water Distribution Networks (WDN), upon a time dependent water demand. The selected test case is a previously studied WDN. Two pumping algorithms give different pumping rules. By solving the nonlinear system of equations, consisting of energy balance equations, mass balance equations and pumping rules, one gets the pumps speed factors. Solutions attached to the Pressure Driven Analysis (PDA) correspond to energy and cost savings, with respect to the solutions given by the Demand Driven Analysis (DDA). The methodology described in this paper is simple and rapid, but the iterative numerical method used to solve the system of equations is highly dependent on the starting guess.
其他摘要:This paper focuses on a methodology allowing to derive the pumping schedule in Water Distribution Networks (WDN), upon a time dependent water demand. The selected test case is a previously studied WDN. Two pumping algorithms give different pumping rules. By solving the nonlinear system of equations, consisting of energy balance equations, mass balance equations and pumping rules, one gets the pumps speed factors. Solutions attached to the Pressure Driven Analysis (PDA) correspond to energy and cost savings, with respect to the solutions given by the Demand Driven Analysis (DDA). The methodology described in this paper is simple and rapid, but the iterative numerical method used to solve the system of equations is highly dependent on the starting guess.