摘要:There are poor physical properties and insufficient natural energy in the low-permeability and low-pressure reservoir of the Yangbaishan Block. Early this reservoir was mined by natural energy with a serious producing energy deficit. Subsequently, it was developed with mild water injection. During the water injection development, water quickly slid into the oil well along the crack, oil production decreased sharply and water content increased rapidly in the oil well, the water flooded well and the ineffective well gradually increased. Therefore, based on the reservoir geological characteristics, principle of injection and production balance is used to optimize reasonably for the development technology policy. Research indicates that the square inverted nine spot flooding pattern is recommended with a reasonable injection well direction of NE 72°and technical well spacing of 150 m. Reasonable injection-production ratio should be 2.16, reasonable technical well pattern density is 23 wells per square kilometer, and the average daily water injection rate of single well should be 11 m3. When injection-production system and injection proration are improved, water drive controlled degree is expected to increase by 16 %. This research can provide reference for the efficient development and safety management of other similar reservoirs.
其他摘要:There are poor physical properties and insufficient natural energy in the low-permeability and low-pressure reservoir of the Yangbaishan Block. Early this reservoir was mined by natural energy with a serious producing energy deficit. Subsequently, it was developed with mild water injection. During the water injection development, water quickly slid into the oil well along the crack, oil production decreased sharply and water content increased rapidly in the oil well, the water flooded well and the ineffective well gradually increased. Therefore, based on the reservoir geological characteristics, principle of injection and production balance is used to optimize reasonably for the development technology policy. Research indicates that the square inverted nine spot flooding pattern is recommended with a reasonable injection well direction of NE 72°and technical well spacing of 150 m. Reasonable injection-production ratio should be 2.16, reasonable technical well pattern density is 23 wells per square kilometer, and the average daily water injection rate of single well should be 11 m3. When injection-production system and injection proration are improved, water drive controlled degree is expected to increase by 16 %. This research can provide reference for the efficient development and safety management of other similar reservoirs.