首页    期刊浏览 2024年11月30日 星期六
登录注册

文章基本信息

  • 标题:Approaches to establishing voltage control requirements for distributed generation units
  • 本地全文:下载
  • 作者:Pavel Ilyushin ; Petr Berezovskiy ; Sergey Filippov
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2019
  • 卷号:139
  • 页码:1-5
  • DOI:10.1051/e3sconf/201913901006
  • 出版社:EDP Sciences
  • 摘要:Analysis of Russian national regulation and technical standards requirements for generating equipment participation in voltage and reactive power control in the power system carried out. Summary of some international experience in voltage control organization under conditions of distributed generation units’ deep integration in public grid is presented in article. Advantages of voltage and reactive power control automation over decentralized and poorly coordinated control are substantiated. Problematic aspects of distributed generation units (including RES) integration, as well as ENTSO-E approaches to voltage and reactive power control in the synchronous zone of continental Europe are considered. Technical requirements of Deutsch and Danish regulations, regarding participation of distributed generation facilities in voltage control are given. Approaches to establishing voltage control requirements for distributed generation units’ operation with national power system are presented.
  • 其他摘要:Analysis of Russian national regulation and technical standards requirements for generating equipment participation in voltage and reactive power control in the power system carried out. Summary of some international experience in voltage control organization under conditions of distributed generation units’ deep integration in public grid is presented in article. Advantages of voltage and reactive power control automation over decentralized and poorly coordinated control are substantiated. Problematic aspects of distributed generation units (including RES) integration, as well as ENTSO-E approaches to voltage and reactive power control in the synchronous zone of continental Europe are considered. Technical requirements of Deutsch and Danish regulations, regarding participation of distributed generation facilities in voltage control are given. Approaches to establishing voltage control requirements for distributed generation units’ operation with national power system are presented.