期刊名称:International Journal of Innovative Research in Science, Engineering and Technology
印刷版ISSN:2347-6710
电子版ISSN:2319-8753
出版年度:2018
卷号:7
期号:5
页码:5234-5242
DOI:10.15680/IJIRSET.2018.0705230
出版社:S&S Publications
摘要:The history of the construction industry worldwide is full of project that were complete significant time and cost overruns in an attempt to rivers this trend ,this study aims at established relation between time overrun and labour productity on construction site in India both description inferential stastics were used in analysing the data result indicate that inadequate fund for the project .Inadequate planning before project takeoff ,inadequate tools and equipment and delay in delivery material .The list of the major causes of time overrun while the use of wrong construction method ,inadequate construction material and inaccurate drawing specification are the key factor causing low labor productivity construction site. Significant negative relationship found between time overrun and labour productivity at construction site. The study concluded by recommending that early appointment of the project manager could ensure proper management of both human and material resources that could guarantee improved productivity and ultimately save project from time overcome. Environmental problem have been considered as a serious situation at the construction waste management is pressing harder with the alarming signal warning the industry. Reused recycle and reproduce waste considered as the only method to recover those waste generated how where the implementation steel have much room for improvement .This paper review the technology on construction waste recycling and there viability .Ten material recycling practices are study including .i)Asphalt ii) Brick ,iii)Concrete ,iv)ferrous metal ,v)glass ,vi)masonry ,vii)nonferrous metal, viii)paper and card board ,ix)plastic and x)timber. The viable technology of the construction material recycling should be providing an easy reference for future application..
关键词:Construction & Demolition Waste Material; Case Study on Construction & Demolition Waste Recycling in pune.