摘要:The risk is significantly reduced for the owner when working on turnkey contracts. The most important
of these risks, for example, is the shortening of the delivery time of the project. However, these contracts are also
exposed to many risks that must be taken into consideration during the various stages of construction of projects
starting from the feasibility study, design stage, tender stage and to the stage of construction up to the operation
The structure of this research is based on a literature review and making questionnaire, with the aim of identifying the
risks inherent in this type of contract and the risks assigned to Egyptian contractors according to its level of importance.
It concluded that out of 34 specific risks allocated in turnkey contracts, most of these risks which constitutes the
majority of the risks are faced the contractor.
According to the survey, it has been concluded that it is from those risks relating to the design and tender stages is
compliance with the requirements of the client and with the tender submitted by the contractor.
The list of risks includes modifications that can occur during work, deletion or addition. The survey also showed that
there are some risks associated with prevailing economic conditions during the survey period in Egypt.