摘要:This paper addresses the flexible manufacturing system (FMS) problems considering both machines
and automated guided vehicles (AGVs), simultaneously. A new fuzzy heuristic (FH) is proposed
for solving the simultaneous scheduling problem, in order to minimize the makespan by
considering the available resources. For increasing the performance of FMS one of the important
factors is scheduling AGV with an integral part of the machine scheduling activity. The algorithm
is tested based on 82 benchmark problems and the achieved makespan are compared with other
algorithms.