摘要:Generators (usually there are several of them) in industrial heat and power plants work in parallel,connected to 6 kV busbars.6 kV busbars are connected to the 110 kV station with at least two (usually several) 110/6 kV transformers.Generator control systems are often incorrectly adjusted,and the algorithms of 110/6 kV transformer controllers are wrong,making cooperation between the control systems in the plant impossible.The article presents a proposal for coordination of algorithms used in control systems.