摘要:The article presents a new algorithm for real-time current overload clearance in power lines.It combines an optimization method with a method of load flow tracing,which may seem a little futuristic,but it enables effective clearance of the effects of exceeded allowed transmission capability.The algorithm is meant for cyclical determination of such an allowed instantaneous value of generated power in each wind farm that makes possible to clear the overload having all the grid constraints satisfied.