摘要:The construction and operation of a control system of a power unit turboset has been described.The controllers use the CWP (Current Work Point) signal from the ACFP (Automatic Control Frequency and Power) system.Such an installation has been made on a power unit in a Power Plant.The control system functions,principle of operation,structure,software and investigation results have been presented.The new LFC (Load Frequency Control) system has been described in this paper.The benefits for the energy-producer are mentioned.Increasing complexity of the control systems of steam turbines has called for the development of diagnostic methods and measures.