摘要:This paper discusses the selection of compensation shunt reactors for a double-circuit 400 kV transmission line using the example of the newly built Elk Bis – Alytus transmission line.The analysis takes into account various conditions of the power system.The published results relate to voltage levels in steady states and during switching processes and short circuits.
关键词:reactive power compensation;overhead lines;shunt reactor