摘要:In each manufacturing plant it is one of the basic requirements to produce the largest quantity of products in the shortest time and at the lowest price. In performance of these requirements used are diverse modern methods,technologies and software which ensure the efficiency improvement of manufacturing, costs minimization,production time minimization etc. Presented article is focused on time structures optimization of real manufacturing process of engineering component by using scheduling software Lekin. It is based on theoretical scientific knowledge on which is afterwards found the optimal layout of the manufacturing process in practice. The optimal layout it created by construction and analysis of Gantt charts in scheduling software Lekin with minimum production time condition.