出版社:Saint Petersburg State University of Architecture and Civil Engineering
摘要:Introduction: The quality control system for construction and installation operations pursues six objectives: completion on time;completion on budget;compliance with the design documents,codes,and standards;safe operations;improvement of skills and experience;environment protection.Purpose of the study: To evaluate reliability of the objectives,correlation between them,and ranking of their priorities within the quality control system for construction and installation operations in Vietnam.Methods: The objectives were evaluated by means of a questionnaire survey conducted in Vietnam,using a five-level scale,based on the reliability coefficient α,correlation coefficient r and mean value М.The sample size was 184.Results: According to the results of the questionnaire survey conducted in Vietnam, homogeneity and correlation between the following objectives was observed: compliance with the design documents, codes,and standards;safe operations;improvement of skills and experience;completion on time;completion on budget;environment protection.The objectives were ranked between two groups of respondents by their experience and roles based on the sample size.
关键词:Quality control;construction;system;construction and installation operations;Vietnam.