  • 标题:Project Realization Scheduling and its Multi Criteria Evaluation
  • 本地全文:下载
  • 作者:Tadeusz WITKOWSKI ; Paweł ANTCZAK ; Arkadiusz ANTCZAK
  • 期刊名称:Foundations of Management
  • 电子版ISSN:2300-5661
  • 出版年度:2009
  • 卷号:1
  • 期号:2
  • 页码:25-44
  • DOI:10.2478/v10238-012-0009-8
  • 语种:English
  • 出版社:Sciendo
  • 摘要:The paper focuses on project scheduling classification issues according to the type of constraints and optimization directions.Special attention was paid to production scheduling,presenting the basic issues in relation with product flow organizational criterion.Open-cluster issue was formulated and analyzed with the use of modern heuristics.Solution was evaluated with multiple criteria,mainly on the basis of time characteristics.Production process flow relations,in coordinates determined by operation sequence at particular workplaces,as well as the production type factor were presented.
  • 关键词:project management;production process;scheduling;optimization;algorithms;multi criteria evaluation
国家哲学社会科学文献中心版权所有