  • 标题:Calculation of PIT 2 Produced Overburden Volume and The Analysis of Preparation of PIT 1 Mine Void Utilization at Supat Block PT.Baturona Adimulya Musi Banyuasin,South Sumatera
  • 本地全文:下载
  • 作者:Edwin Harsiga ; Taufik Toha ; Syamsul Komar
  • 期刊名称:IJEMS (Indonesian Journal of Environmental Management and Sustainability)
  • 印刷版ISSN:2598-6260
  • 电子版ISSN:2598-6279
  • 出版年度:2018
  • 卷号:2
  • 期号:2
  • 页码:42-47
  • DOI:10.26554/ijems.2018.2.2.42-47
  • 语种:English
  • 出版社:ARTS Publishing Corp.
  • 摘要:PT Baturona Adimulya is a coal mining company located in Babat Supat Subdistrict,Musi Banyuasin Regency,South Sumatera Province.Based on the calculation of overburden digging volume at Pit 2 with progress survey that is measurement using total station sokkia set 3010 instrument and the processing and calculation using surpac 6.5.1 result in overburden volume or cover ground 251,941 BCM.Coal mining in open pit will cause environmental changes,either small hills or mined holes (voids).The burden removing from Pit 2 by backfilling method in the mining area will minimize the voids that occur.PT Baturona Adimulya has void in Pit 1 as large as 4.8 Ha,and will do backfilling that requires overburden material as much as 295.721 BCM/Ha and top soil as much as 33,600 LCM/Ha.The voids left at the end of the mine without any utilization planning have the potential to cause undesirable impacts on the environment.Therefore,PT Baturona Adimulya is planning to revegetate the void area so it can be utilized and become a green field again as before.
  • 关键词:Overburden;reclamation;backfilling