摘要:Submitted by generalized experience entry longwall into predriven recovery room (PDRR) in foreign and Russian mine.Submitted by research characteristic state parameters of the roof at failed entry. Give a classification of roof collapse at the entrance longwall into PDRR.On the example of longwall panel 5а-10-18 mine Raspadskaya reviewed formation process of stress-strain condition in area for PDRR. Has been modeled process of entry longwall into PDRR in the conditions of heavy roof. Determine the expected load on the anchor and standing support, installed in the PDRR. Assessed the load on the longwall shield. When calculating the loads was taken into account the following parameters: width pre-driven recovery room, number of standing support in the PDRR and especially its placement, the rate of entry longwall into PDRR.
其他摘要:Submitted by generalized experience entry longwall into pre- driven recovery room (PDRR) in foreign and Russian mine.Submitted by research characteristic state parameters of the roof at failed entry. Give a classification of roof collapse at the entrance longwall into PDRR.On the example of longwall panel 5а-10-18 mine Raspadskaya reviewed formation process of stress-strain condition in area for PDRR. Has been modeled process of entry longwall into PDRR in the conditions of heavy roof. Determine the expected load on the anchor and standing support, installed in the PDRR. Assessed the load on the longwall shield. When calculating the loads was taken into account the following parameters: width pre-driven recovery room, number of standing support in the PDRR and especially its placement, the rate of entry longwall into PDRR.