摘要:One of the current trends in the technology of supporting capital and preparatory workings is the use of contact grouting. The contact grouting is designed to increase the bearing capacity of the frame supports. The paper considers a method for calculating the support pressure and the displacement of the support crown. The calculation method is based on the interaction of the system of blocks “support – filling layer - broken rock layer - undisturbed rock”. The following factors were taken into account in the method of calculating the frame arch support: depth of the roadway development, mine working cross-section, the support section, the width of the filling layer and its deformation characteristics, as well as the deformation and strength characteristics of the rock mass. Checking of the support strength state is done by comparing the calculated load versus the rated bearing capacity of the support. The developed technique allows making the choice of support in various mining conditions of the application.