摘要:The article describes the research methods of the stress-strain of reinforced concrete framings (piles and pylons) using embedded strain gauges. The relations of load to indirect reactive characteristics displayed by the weighing device which were obtained through laboratory tests of framings reference specimens are given. Summary tables of framings stress-strain monitoring results gained during the II Phase of construction project (after base plate concreting for piles and floor slab concreting for pylons) are included. The study of obtained results of actual framings stress will allow reducing construction material consumption through the reduction of the safety factors on reliability.