期刊名称:Pubawidya: Jurnal Penelitian dan Pengembangan Arkeologi
印刷版ISSN:2252-3758
电子版ISSN:2528-3618
出版年度:2016
卷号:5
期号:1
页码:49-66
DOI:10.24164/pw.v5i1.76
出版社:Balai Arkeologi Jawa Barat
摘要:Karawang is the settlement which has existed since classical period and developed rapidly in the early 20th century. Karawang district is known as the country’s rice producers. At the time of enactment of ethical politics, irrigation networks and railroads was built in Karawang. The economic infrastructure certainly influenced the development of the towns. The problem discussed was on how the pattern of settlement in Karawang after the construction of the economic infrastructure was formed. The method applied is through descriptive method. Data collected through observation and literature study. The results showed that the settlement in which railway station facilities is located are developing very rapidly. The pattern of the settlements follows the path of transportation.
其他摘要:Karawang merupakan pemukiman yang sudah ada sejak masa klasik dan berkembang
pesat pada awal abad ke-20. Karawang dikenal sebagai kawasan produsen padi. Pada
masa diberlakukannya politik etis, di Karawang dibangun jaringan irigasi dan rel
kereta api. Prasarana perekonomian tersebut tentunya berpengaruh pada perkembangan
beberapa kota. Tujuan penulisan adalah mengetahui seputar perkembangan kota-kota di
Karawang setelah dibangun prasarana perekonomian tersebut. Metode yang diterapkan
adalah melalui metode deskriptif. Pengumpulan data dilakukan melalui observasi
dan studi pustaka. Hasil pengamatan menunjukkan bahwa pemukiman yang terdapat
fasilitas stasiun kereta api mengalami perkembangan. Pola pemukiman mengikuti jalur
transportasi.