摘要:In this paper, the method of combining high-density electrical exploration and borehole joint profile is used to explore the Dancun-Longyang town fault at the LNG peak shaving station and gas supply pipeline engineering site of Luyang lake. The distribution and activity of the fault are determined, providing a basis for seismic fortification and seismic geological disaster evaluation in the line.