首页    期刊浏览 2024年11月15日 星期五
登录注册

文章基本信息

  • 标题:Influence of the effect of loading time indicators on optimization of programming development of ERP software
  • 其他标题:ВПЛИВ ЕФЕКТУ ЧАСОВИХ ПОКАЗНИКІВ ЗАВАНТАЖЕНОСТІ НА ОПТИМІЗАЦІЮ СТВОРЕННЯ СПЕЦІАЛЬНОГО ПРОГРАМНОГО ЗАБЕЗПЕЧЕННЯ ERP СИСТЕМИ
  • 本地全文:下载
  • 作者:Vitalii Fedoriienko
  • 期刊名称:Системи озброєння і військова техніка
  • 印刷版ISSN:1997-9568
  • 电子版ISSN:2518-1580
  • 出版年度:2018
  • 卷号:56
  • 期号:4
  • DOI:10.30748/soivt.2018.56.20
  • 语种:English
  • 出版社:Ivan Kozhedub Kharkiv National Air Force University
  • 摘要:It is common knowledge that any software and hardware complex requires attention to maintain its working capacity. The ERP system manufacturers (Enterprise Resource Planing) offer their own standard software with maximum approximation of tools and software modules to use functional needs. Considering attention at the specifics of the using area,the level of reaching,and maintaining compliance with national,sectoral,and internal requirements acts determine the complexity of the project. In ERP systems,there are a number of aproaches for conducting work to maintain the system in working condition. One of the aproachs of control ERP systems is monitoring of system load,the key indicator of which is the time factor. There is a contradiction between the requirement for monitoring,as a procedure for rapid control of system performance. Further its optimization with the allocation of the hierarchy will also allow to influence the evaluation of the activity of programmers of different qualification classes. Qualitative control of the effectiveness of programmers is achieved at the stage of implementation and support of the project. The efficiency of the system may be controlled by changing the additional factor - the performance time of the system. The qualification division of programmers is mathematically substantiated by the parameter of the intensity of making mistakes in their programs,0,1,0,3 and 0,7 respectively for I,II and III classes [8]. The optimization model has resource limitations on time,cost (wage),and quality,and the number of programmers in the project team. As indicator of the efficiency of software,time values were used with the specified limit values during the ime of its creation and modification. These type of problem shows time indicators of system loading. There is a “bottleneck” in the system that may cause the problem in the developed program. This may be a consequence of the programmer's activity. As indicators of the effect of SDR performance during its creation of modifications,time indicators were used with the specified limit values (Table 1). The above-mentioned kind of troublesome value of the time values of the system's load indicates that there is a “bottleneck” in the system that may lead to a program with errors,as a consequence of the programmer's activity. The presence of a hierarchical structure allows a person responsible for the efficiency of the system in time to make a managerial decision after a quick assessment of the system. This allow us to fully monitor and optimize system performance during project management. Thus,the methodology for making a decision on selecting a design team was improved. An optimal solution for developing and modifying software is based on the limitation of the number and quality of programmers,wages and time.
  • 其他摘要:Проведений аналіз контролю працездатності по часовим показникам ERP системи та розкриті основні з них. Запропоновано новий структурний підхід ієрархічної побудови взаємозв’язків часових показників завантаженості системи. Визначені суб’єкти створення та мо
  • 关键词:temporal indices of load;quality levels of programmers;optimization model;hierarchy rhythm of time indices
  • 其他关键词:часові показники завантаженості;класність програмістів;оптимізаційна модель;ієрархія часових показників.
国家哲学社会科学文献中心版权所有