首页    期刊浏览 2024年11月24日 星期日
登录注册

文章基本信息

  • 标题:FCB system analysis and performance test results of 1000MW ultra supercritical coal fired power station
  • 本地全文:下载
  • 作者:Zhang Shuying ; Li Lin ; Zhang Cuihua
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2021
  • 卷号:233
  • 页码:4013
  • DOI:10.1051/e3sconf/202123304013
  • 出版社:EDP Sciences
  • 摘要:Fast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring great benefits for the rapid recovery of local power grid. Taking Taishan Power Plant 1000 MW unit as a research object, the feasibility scheme of adding FCB function was analyzed and demonstrated on the basis of making full use of the original equipment design margin. The FCB test of TMCR 100% load was completed. The test results and problems during FCB process were discussed, and the corresponding countermeasures were proposed.
  • 其他摘要:Fast cut back (FCB) function can make the power station restore the external power supply in a very short period of time from the auxiliary power operation conditions through self-help mode. In case of large-scale power grid failure, FCB further ensures the safety of the main equipments and bring great benefits for the rapid recovery of local power grid. Taking Taishan Power Plant 1000 MW unit as a research object, the feasibility scheme of adding FCB function was analyzed and demonstrated on the basis of making full use of the original equipment design margin. The FCB test of TMCR 100% load was completed. The test results and problems during FCB process were discussed, and the corresponding countermeasures were proposed.
国家哲学社会科学文献中心版权所有