摘要:A swivel cable-stayed bridge over the existing railway is a span across the existing railway. The recommended scheme for the main bridge is (128 388 128) m steel mixed composite beam swivel diagonal pull bridge with span. The cables of the diagonal pull bridge are arranged according to the fanshaped central double cable plane, taking into account the mechanical performance and aesthetics. The bridge structure adopts semi floating system. The concrete swivel diagonal pull bridge is adopted in the comparison scheme. The design of the bridge is three spans and (138 268 138) m prestressed concrete box girder is adopted. The cables are arranged according to the central double cable plane, and the bridge composition adopts the consolidation system. Considering the needs of bridge operation and maintenance in the later stage of the bridge, when the dead weight of concrete diagonal pull bridge is within the ideal range, the concrete swivel diagonal pull bridge can be preferred. In order to calculate the dead weight of the selected bridge, the author uses the finite element software to model the whole bridge and calculate the weight of the bridge. The results show that the dead weight of the concrete swivel diagonal pull bridge is too large, which has exceeded the maximum bearing capacity of the existing spherical hinge. In order to continue to use the concrete swivel diagonal pull bridge scheme, it is necessary to optimize the design of the concrete swivel diagonal pull bridge scheme.
其他摘要:A swivel cable-stayed bridge over the existing railway is a span across the existing railway. The recommended scheme for the main bridge is (128 388 128) m steel mixed composite beam swivel diagonal pull bridge with span. The cables of the diagonal pull bridge are arranged according to the fanshaped central double cable plane, taking into account the mechanical performance and aesthetics. The bridge structure adopts semi floating system. The concrete swivel diagonal pull bridge is adopted in the comparison scheme. The design of the bridge is three spans and (138 268 138) m prestressed concrete box girder is adopted. The cables are arranged according to the central double cable plane, and the bridge composition adopts the consolidation system. Considering the needs of bridge operation and maintenance in the later stage of the bridge, when the dead weight of concrete diagonal pull bridge is within the ideal range, the concrete swivel diagonal pull bridge can be preferred. In order to calculate the dead weight of the selected bridge, the author uses the finite element software to model the whole bridge and calculate the weight of the bridge. The results show that the dead weight of the concrete swivel diagonal pull bridge is too large, which has exceeded the maximum bearing capacity of the existing spherical hinge. In order to continue to use the concrete swivel diagonal pull bridge scheme, it is necessary to optimize the design of the concrete swivel diagonal pull bridge scheme.