其他摘要:Industrial parks cover a variety of production capacities and energy-consuming entities, with large load demand and complex energy-using structure, and common problems such as low energy utilization efficiency and unreasonable energy structure. The construction of an integrated energy system (IES) with a combined cooling, heating and power system as the core unit in the industrial park is of great significance for achieving reliable, efficient and clean energy use in the park. Therefore, this article is based on the integrated energy system of the industrial park, aims at the lowest total cost of park operators, and considers the constraints of grid node balance, equipment output and energy storage equipment, and constructs source-grid-load-storage linkage operation optimization model, and build a chaotic particle swarm algorithm (CPSO) to solve the model. Finally, a typical industrial park in my country is taken as an example to analyze the scientificity of the model.