首页    期刊浏览 2024年11月27日 星期三
登录注册

文章基本信息

  • 标题:Research on Design and Operation Method of Dewater and Filled System for Cushion Pool of High Dams ——Taking the project of BHT hydropower plant in China as an example
  • 本地全文:下载
  • 作者:Fang Jie ; Cao Chunjian ; Li Shengbing
  • 期刊名称:E3S Web of Conferences
  • 印刷版ISSN:2267-1242
  • 电子版ISSN:2267-1242
  • 出版年度:2021
  • 卷号:248
  • 页码:3066
  • DOI:10.1051/e3sconf/202124803066
  • 出版社:EDP Sciences
  • 摘要:Dam is set in large hydropower station. Cushion pool is built behind the dam for the flood discharge and energy dissipation of the reservoir. Operation of flood discharge and energy dissipation for some time, Cushion pool is dewatering and structure safety of which is study, then cushion pool is filled. Temporary dewater and filled system is used by previous engineer, but is arranged and controlled hard. Based on need of the cushion pool dewatering and filling, for an example of Baihetan hydropower station, necessity and feasibility are study. Then a permanent dewatering and filling system is designed for cushion pool. Design principle and arrange method are described. Many technical difficulties are study and resolved such as effect of valley deformation on the control system of dewatering and filling, demand of dewatering and filling device parameter, performance quota formulate based on large water level amplitude, protective measures in the working condition of much silt on the downstream and humidity in the equipment room of the second-dam and project of dewater drainage outlet under the water. By gravity drainage and filling based on water level difference and pump drainage, much electric energy is saved and personnel operating environment and working conditions are improved.
  • 其他摘要:Dam is set in large hydropower station. Cushion pool is built behind the dam for the flood discharge and energy dissipation of the reservoir. Operation of flood discharge and energy dissipation for some time, Cushion pool is dewatering and structure safety of which is study, then cushion pool is filled. Temporary dewater and filled system is used by previous engineer, but is arranged and controlled hard. Based on need of the cushion pool dewatering and filling, for an example of Baihetan hydropower station, necessity and feasibility are study. Then a permanent dewatering and filling system is designed for cushion pool. Design principle and arrange method are described. Many technical difficulties are study and resolved such as effect of valley deformation on the control system of dewatering and filling, demand of dewatering and filling device parameter, performance quota formulate based on large water level amplitude, protective measures in the working condition of much silt on the downstream and humidity in the equipment room of the second-dam and project of dewater drainage outlet under the water. By gravity drainage and filling based on water level difference and pump drainage, much electric energy is saved and personnel operating environment and working conditions are improved.
国家哲学社会科学文献中心版权所有