首页    期刊浏览 2025年02月22日 星期六
登录注册

文章基本信息

  • 标题:Weighted Multi-Skill Resources Project Scheduling
  • 本地全文:下载
  • 作者:Fawaz S. Al-Anzi ; Khaled Al-Zame ; Ali Allahverdi
  • 期刊名称:Journal of Software Engineering and Applications
  • 印刷版ISSN:1945-3116
  • 电子版ISSN:1945-3124
  • 出版年度:2010
  • 卷号:3
  • 期号:12
  • 页码:1125-1130
  • DOI:10.4236/jsea.2010.312131
  • 出版社:Scientific Research Publishing
  • 摘要:In this paper, we present an extension of the classical Resource Constrained Project Scheduling Problem (RCPSP). We present a new type of resource constraints in which staff members are involved. We present a new model where staff members can have several skills with different proficiency, i.e., a staff member is able to perform more than one kind of activity as well as the time need is complete the task assign depends on the staff individual skill. We call this model the Weighted-Multi-Skill Project Scheduling Problem (WMSPSP). In our model, an activity has specific skill requirements that must be satisfied. To solve this problem, we propose a lower bound that uses a linear programming scheme for the RCPSP.
  • 关键词:Weighted; Multi-Skill; Software; Project Scheduling; Lower Bound
国家哲学社会科学文献中心版权所有