首页    期刊浏览 2025年05月10日 星期六
登录注册

文章基本信息

  • 标题:Run of River Bulk Hydroelectric Generation from the Congo River without a Conventional Dam
  • 本地全文:下载
  • 作者:Thomas J. Hammons ; Pathmanathan Naidoo ; Lawrence Musaba
  • 期刊名称:Natural Resources
  • 印刷版ISSN:2158-706X
  • 电子版ISSN:2158-7086
  • 出版年度:2011
  • 卷号:2
  • 期号:1
  • 页码:18-21
  • DOI:10.4236/nr.2011.21003
  • 出版社:Scientific Research Publishing
  • 摘要:The paper discusses harvesting the Congo River for bulk hydroelectric generation based on run of river, low head generation technology, as employed at the existing Inga 2 power station in the Democratic Republic of Congo. The evolutionary approach builds on existing infrastructure.The results show that the footprint is much smaller than that which employs a conventional dam. The environmental impact is minimized. These collectively will contribute to lower capital costs. In summary, 10,000 cm³/sec of constant river flow will produce 5,000 MW of base power. On average, the constant recorded flow of the river is 30,000 cm³/sec and a total of 15,000 MW of base power generation is possible.
  • 关键词:Hydroelectric Power Generation; River Engineering; Environmental Iimpact; Hydropower Development in DRC
国家哲学社会科学文献中心版权所有