首页    期刊浏览 2024年12月01日 星期日
登录注册

文章基本信息

  • 标题:Ensuring the Future Construction of Electricity Generation Plants: The Challenge of Maintaining Reliability in New U.S. Wholesale Electricity Markets
  • 本地全文:下载
  • 作者:A. Joseph Cavicchi ; Andrew Kolesnikov
  • 期刊名称:IAEE Energy Forum (formerly: IAEE Newsletter)
  • 印刷版ISSN:1093-4243
  • 电子版ISSN:1944-3188
  • 出版年度:2005
  • 卷号:1
  • 页码:13-13
  • 出版社:International Association for Energy Economics
  • 摘要:Several independently-operated, federally regulated, hourly wholesale electricity markets have been established in the U.S. during the last several years. Driven by the U.S. Federal Energy Regulatory Commission’s (FERC) landmark 1996 regulatory order providing open access to the U.S. high voltage transmission network, various regions embraced the opportunity to form sophisticated, internet-based trading plat­forms that produce transparent hourly spot prices for whole­sale electricity supplies. Concomitantly in most regions where these markets were introduced, significant investments in new, high-efficiency, low-emission electricity generators have occurred. These investments flooded the marketplace with excess supply of electricity generating capacity, quickly revealing weaknesses in the underlying market structures and resulting in documented under-compensation of generating capacity clearly required to maintain system reliability. The recognition that market modifications must be considered has resulted in numerous FERC proceedings focused on resolv­ing the problem before a crisis ensues.
国家哲学社会科学文献中心版权所有