首页    期刊浏览 2024年11月24日 星期日
登录注册

文章基本信息

  • 标题:Organizing transportation on a double-track line under conditions of major overhaul on one track
  • 本地全文:下载
  • 作者:Bošković Branislav ; Ivić Miloš ; Marković Aleksandar
  • 期刊名称:Yugoslav Journal of Operations Research
  • 印刷版ISSN:0354-0243
  • 电子版ISSN:1820-743X
  • 出版年度:2006
  • 卷号:16
  • 期号:1
  • 页码:97-105
  • DOI:10.2298/YJOR0601097B
  • 出版社:Faculty of Organizational Sciences, Belgrade, Mihajlo Pupin Institute, Belgrade, Economics Institute, Belgrade, Faculty of Transport and Traffic Engineering, Belgrade, Faculty of Mechanical Engineering, Belgrade
  • 摘要:

    The problem of traffic organization on a railway line during the execution of civil works on super and sub-structures maintenance under the present conditions is becoming more and more difficult to solve, above all, due to the increased traffic intensity. In order to make decisions on indispensable measures to be taken under such circumstances, one needs information on train compositions and their delays, line capacity, facilities, etc. In order to obtain such information, it is necessary to use a computer simulation which significantly enhances the range of the problem to be solved and offers answers to the questions that cannot be solved by analytical models alone. The paper presents a simulation model of the trains’ movement on a double-track line when one track is closed to traffic due to the work executions. Such model will provide a better quality of decision-making in the process of traffic organization under given circumstances.

  • 关键词:double-track line; track overhaul; traffic simulation
国家哲学社会科学文献中心版权所有