期刊名称:International Journal of Software Engineering and Its Applications
印刷版ISSN:1738-9984
出版年度:2013
卷号:7
期号:3
出版社:SERSC
摘要:Test Management is the process of managing the software test life cycle (STLC) of the application under test (AUT). It starts with test planning activity and ends with test results reporting. The objectives of test management are to manage requirements dynamically, effectively utilize the 'testing cycle' time and efficient use of testers in terms of their productivity. Test management tool known as 'Quality Center (QC)' is widely used for managing the STLC of the project. Test case prioritization techniques schedule test cases for execution in an order that attempts to maximize some objective function. A variety of objective functions are applicable; one such function involves rate of fault detection — a measure of how quickly faults are detected within the testing process. An improved rate of fault detection during regression testing can provide faster feedback on a system under regression test and let debuggers begin their work earlier than might otherwise be possible. In this paper we have presented a method of choosing risk-based test cases. Our risk analysis is based on a practical risk model, and is similar to that used by some organizations.
关键词:Failure Mode Effect Analysis (FMEA); Risk Priority Number (RPN); Risk;Exposure Factor (REF); Regression Test Suite