期刊名称:International Journal of Advanced Research In Computer Science and Software Engineering
印刷版ISSN:2277-6451
电子版ISSN:2277-128X
出版年度:2013
卷号:3
期号:5
出版社:S.S. Mishra
摘要:In this paper, Genetic Algorithm is used to solve the profit based unit commitment for deregulated power system in order to achieve optimal generation schedule and maximum profit of GENCOS. Deregulation of power system means unbundling of vertically integrated power system into generation, transmission and distribution companies. This proposed algorithm or approach is tested on IEEE-30 bus system with 6 generating units as an individual GENCO.
关键词:degeneration; profit based unit commitment; genetic algorithm; ELD