摘要:This paper focuses on meeting the customer demand by improving the man power utilization, enhancing the machining capacity and improving material flow .The productivity improvement is made through modification of shop floor layout which supports the multi machine manning and streamlining the material flow in between the machines. The cycle time analysis and part flow analysis is carried out to group the machines which look more in detail on bottleneck processes. The machines are low cost automated hence, the operator only has to perform the set up and the machine does the rest of the process automatically. Thus the operators are less of loaded with work content, effective utilization of manpower becomes more important and critical to bring up the productivity. The analysis on machine utilization and layout of machinery is made to enhance the machining capacity of the shop floor.