摘要:Evaluates the performance of the Bhadra Reservoir Project-before, during, and after the introduction of modernization with structured system design. Analysis focuses on water management, agricultural productivity, and farmer participation and perception. Identifies the absence of a continuing support mechanism and lack of farmer participation as the major causes for the project's decline.