摘要:Problem statement: A sediment analysis study was conducted at the Chini River on 16 and 31 August 2008. This study was conducted to review the formation of suspended sediment load in the Lake Chini catchment area, which flows into the Pahang River via the Chini River. Approach: Three sampling stations were chosen, the first one at upstream Chini River (S1), mid-stream Chini River (S2) and downstream Chini River (S3). Three parameters were quantified for this study, namely: distribution of sediment grain size (g), concentration of suspended sediment (mg L-1) and river discharge values (in m3 sec-1). Results: The findings of the study show that the sizes of sediment fall between phi
关键词:Suspended sediment yield; sediment concentration; particle size; river flow values