摘要:The optimum load distribution between the hydropower units is an effective measure for reducing the total water rate and increasing the energy output of a hydropower station, and it is becoming a more interesting studying topic. In order to increase the economic benefit of the station, a multi-objective optimization model of load allocation between hydropower units is established in accordance with the characteristics and particularity of the hydropower station, and the minimum water rate of the station is used as the optimal objective, the Glowworm Swarm Optimization (GSO) algorithm is applied to optimization of the model, The simulation shows the method could easily get the best solutions of load allocation between hydropower units and reflect the actual operation situation of the hydropower station much better. So the proposed scheme has an important reference value for other hydropower stations.